LTA Civil Design Criteria — chapter catalogue

Edition:

Civil Design Criteria for Road and Rail Transit Systems, Rev A3, document E/GD/09/106/A3, issued 2025-12. Official PDF (LTA). Checked 2026-11-01.

Civil & Structural Works (listed as "Civil Design Criteria for Civil & Structural Works", Rev A3, Dec 2025). Official listing page last updated 17 Sep 2026 (checked 1 Nov 2026). Latest publicly listed edition. It does not by itself establish the edition applicable to a particular contract — select the project edition and record amendments.

Ch.Official titlePlanning label / proposed contentCoverage
1 GENERAL General — Design-basis builder; source register; assumptions schedule; calculation QA and revision checklist (Initial release) 7 clauses indexed · 1 modules mapped · 0 tools released
2 TRACK ALIGNMENT Rail alignment — Geometric exercises; curvature, cant and transition worksheets; clearance review (Specialist release) 0 clauses indexed · 0 modules mapped · 0 tools released
3 ACTIONS Actions — Action schedule; self-weight; surcharge/water pressure worksheets; verified combination builder (Initial release, bounded scope) 3 clauses indexed · 4 modules mapped · 0 tools released
4 TRACKWORK Track systems — Track interface exercises; component schedules and inspection/design checklists (Lessons/checklists first) 0 clauses indexed · 0 modules mapped · 0 tools released
5 GEOTECHNICAL PARAMETERS Ground parameters — Borehole interpretation exercises; layer and groundwater schedules; parameter provenance and sensitivity worksheets (Initial release) 0 clauses indexed · 1 modules mapped · 0 tools released
6 FOUNDATIONS, PERMANENT RETAINING STRUCTURES AND EARTHWORKS Foundations and earthworks — Foundation exercises; pile-load schedules; retaining-wall worksheets; settlement and earthworks training (Staged engineering review) 1 clauses indexed · 1 modules mapped · 0 tools released
7 BORED TUNNELS AND RELATED WORKS Bored tunnels — Input preparation; lining action schedules; analytical benchmark exercises; specialist model review (Advanced training first) 0 clauses indexed · 0 modules mapped · 0 tools released
8 UNDERGROUND STRUCTURES Underground works — Buoyancy worksheet; concrete detailing exercises; water-related checks; analysis report interpretation (Bounded tools then advanced work) 1 clauses indexed · 1 modules mapped · 0 tools released
9 ABOVE-GROUND STRUCTURES Elevated works — Concrete/steel member exercises; bearing and joint movement schedules; inspection-access reviews (Staged engineering review) 0 clauses indexed · 0 modules mapped · 0 tools released
10 ROAD Roads — Geometry and grade exercises; clearance checklists; drainage input preparation (Bounded tools and external references) 0 clauses indexed · 0 modules mapped · 0 tools released
11 EXTERNAL WORKS External works — Paving take-offs; railing exercises; landscape interface reviews (Later general-engineering release) 0 clauses indexed · 0 modules mapped · 0 tools released
12 EMBEDDED RETAINING WALL FOR EXCAVATION Excavation support — Staging and load schedules; basal/hydraulic failure exercises; strut/waler checks; numerical-model review (Advanced release) 0 clauses indexed · 0 modules mapped · 0 tools released
13 INSTRUMENTATION Monitoring — Import readings; calculate movement/rates; plot trends; compare with approved project review levels (Initial release) 3 clauses indexed · 1 modules mapped · 0 tools released
14 IMPACT ASSESSMENT OF BUILDINGS AND UTILITIES Neighbouring assets — Movement-profile exercises; differential movement and distortion calculations; impact assessment reports (Staged, screening scope) 1 clauses indexed · 1 modules mapped · 0 tools released
15 ACTIVE MOBILITY INFRASTRUCTURE Walking/cycling facilities — Path geometry, crossfall and gradient exercises; visibility checklists (Later bounded release) 0 clauses indexed · 0 modules mapped · 0 tools released

Coverage counts indexing, mapping and release separately. A chapter page existing does not mean its content is complete. Titles were taken from the official table of contents; each is marked verified only after an engineering checker confirms it against the PDF.